On the Rise; Adding the Stair Risers, Finishing the Runners
18 August 2011
You can see in the picture below how the tread just sort of ends. But the whole point was to have it wrap around the side. In order to figure out all the dimensions, we measured everything out so we would know what exactly we would need, and Justin got to work... of course we had some "help"
Labels:
Our Projects,
Park House,
Park House Entry,
Stairs
Walnut Stain... at last! Stair Update!
11 August 2011
And finally stained! YEA!
Labels:
Our Projects,
Park House,
Park House Entry,
Stairs,
Wood,
Wood Flooring
Filling the Gaps: Stair Remodel
21 June 2011
When we cleaned up the stairs, we took off each tread and sanded and routed the nose. Then put them back in place with some screws for a temporary hold. Later as we finished the project they would be easy to remove when necessary but we could still walk up and down safely -just a little tip in case you are trying this at home, until you are DONE don't re-glue and nail yet!
Anyway, to fill the gap we started off by adding a diagonal molding that runs just above the nose of each stair tread from the bottom stair to the top. This created a triangular space above the stair support. Which meant all we had left to do was fill that space. We (meaning Justin- good thing someone is really patient in this family!) carefully measured each triangle that was left below the molding and cut out a piece of MDF to fill it up.
Nailed in place it looked like this(below). We also traded out the molding we had in the pictures above to a simple basically rectangular molding to simplify the profile.
We had to trim or straighten the cuts on some of the treads, but for the most part, this little triangular molding, just filled the existing huge gaps.
When they were all nailed in place, I caulked any gaps, and we installed the risers (even though they will be covered) and painted a few coats of white paint.
For the rest of the story, check out these posts too: The Plan, Part 1, Part 2, Part 3, Part 4, Part 5, Part 6 and Part 7
New Enclosed Loft Space At The Top Of The Stairs
Labels:
Our Home,
Our Houses,
Our Projects,
Park House,
Park House Entry,
Stairs
The Next Step, Staircase Remodel Project
08 June 2011
Sorry I am so slow with posts.... honestly it drives me crazy not having the time to do it, but hopefully when I grow up I will be really good at it! (that is IF I ever grow up...hum)
The last time we talked about the staircase remodel we had removed the railing and all the carpeting, and begun to redesign the newel posts.
The Plan
So let's show you what we did next. We were left with this:
When working on these sort of projects, we usually put the babies to sleep, grab a treat, and a bunch of scrap paper and wood so that we can discuss (in 3d) how we each see it working, and what looks right. We move these little scraps around, do a lot of measuring, discuss a little, draw a lot of little sketches and then when we are happy and the project gets on it's merry way!
Once the pieces were all measured and ready to install, we (okay, maybe not we exactly just Justin) cut the flooring out of the way. Then nailed and glued the new stairs supports in place.
We also took off all the stair treads one at a time and sanded them, to get all the junk off- namely the heck-a ugly plaster texture that landed on the stairs from the walls- (my love for this house would be so much more if it didn't have that darn texture on the walls (and everywhere else it landed...urgh!)
Anyway, while the stairs were off we also routed the front two edges, to give them a prettier nose. Then we put them back down temporarily held in place with a few screws (there were still a few problems that needed to be addressed- that I will show you next time)
Like all the Christmas and other holiday storage boxes under my stairs?... No I didn't spend money on pretty boxes, darn!
Next Justin installed the bottom two treads, by gluing them with construction adhesive and the framing nailer.
We actually had to buy two more 2 x 12's, and since the stairs were so much bigger, and we couldn't use the original. In order to make them look sorta older like the others, we choose to just nail them right in and not hide the nail holes, because the other boards still had theirs showing.
The second stair tread slid into place around the future newel post support.
Okay, so now the treads are in place, sanded and ready to be finished, the problem? A minimum of 1/2 inch gaps on either side of the treads (see picture below). So we had to figure out a way to fill the gap. Which I will explain next time.
Read it all: The Plan, Part 1, Part 2, Part 3, Part 4, Part 5 and Part 6
Labels:
Our Home,
Our Projects,
Park House,
Park House Entry,
Stairs
Working With What We Have Stair Treads PR 6
10 May 2011
We left off our stair remodel with a big huge MESS! And it was about to get messier pretty quick. If you noticed in the plan, from before we had the newel posts moved back to open the space. So we got to work on that deconstruction/construction next:
We plan on re-using the railing so we took it apart carefully and actually left a lot of it intact. Anything we did cut we made sure to cut a little long. Here Justin is cutting back the railing and removing it all:
You can see behind Justin that the railing is still mostly in one piece. (and technically it still is...just sitting in the closet, not on the stairs, but hopefully soon!) The next side is on the chop list!! The space already feels SO much bigger!!
Not photographed we nailed in a support for those boards in the wall (above). Then installed the structural part of the post. Don't laugh at us if we don't do it exactly right we wanted to make sure it was nice and strong, and you better believe this thing is not coming out. When we are closer to getting done, we will put the pretty part on top of it. We also re-used bits and pieces of 2 x 4wood that we already had, so some of it is randomly painted.
In case you want to follow along, check out these posts too: The Plan, Part 1, Part 3 and Part 4
Labels:
Our Home,
Our Projects,
Park House,
Park House Entry,
Stairs
A million years ago... The Staircase Remodel PR 5
05 May 2011
Back when the dinosaurs roamed the earth... In March 2010, I decided to redo our stairs. I had a few goals in mind. Make the space look custom, and open it up. As it was, the existing newel posts made the entry sorta feel cramped. The carpet was getting pretty worn (thanks to my cats taking the corners too fast while chasing each other, there was a 3 inch hole in the carpet) and since wood floors were the ultimate plan well I decided I needed to investigate.
One day, while Justin was at work (naughty wife) I pulled a corner of the carpet up to see what it looked like under there. Not so good, no pretty finished stairs that other people seem to luckily find. No mine were plain old structural pine lumber covered in plaster and paint splatters, with huge unfinished gaps... But I was still determined!
So I think I talked to my husband about it... We discussed options and came up with a plan (posted about here). To refresh your memory here is what the stairs looked like:
Above is my own little furry Vanna (Buddy) White showing you how to pose by the stairs!
At first I tried scraping the plaster off the stairs. It worked in some places, but in others it sorta splintered the wood, so I had to stop.
You can see one of the holes that the cats had created by speedy-Gonzales-ing it around the corner. They would catch that spot with their back claws, and literally the hole got bigger everyday... silly beast (a secret thank you from mom for giving me an excuse to rip out the carpet!!! kisses!)
Read more...
Labels:
Before and After,
Our Houses,
Our Projects,
Park House,
Park House Entry,
Stairs





















